The Bowie #29-2 (1608′ FNL; 330′ FEL Sec. 29-T11S-R32W) was spud April 16, 2018 by WW Drilling, LLC Rig #10. Five drill stem tests were run by Diamond Testing and open-hole logging was provided by Halliburton. On April 25 5.50″ production casing was set and cemented at 4736′ by Basic Energy Services. Well site geological supervision was performed by Kitt Noah. The well is currently undergoing completion operations from undisclosed formations.