On April 5, 2021, the Bear #26-1 (675’ FSL; 1450’ FEL Sec. 26-T9S-R13W) was spud as a wildcat test. The well was drilled to an RTD of 3475’ and 4.50” production casing set to attempt completion as an oilwell. After extensive completion operations the Bear #26-1 was plugged and abandoned on May 11, 2021 as a dry hole.