On April 5, 2022, the Steinle #4-32 (630’ FNL; 2016’ FEL Sec. 32-T15-R14W) was spud as a development well. Southwind Drilling Rig #1 provided rotary tools. Kitt Noah provided on-site geological supervision. The well was drilled to an RTD of 3450’ and 5.50” production casing set. The well was completed and placed into production on June 2, 2022. Initial production rates were reported at 35 BOPD. Russell Oil Exploration Geologist Kitt Noah provided on-site geological supervision. Todd Brown, Russell Oil Drilling/Production Superintendent provided well completion supervision.